Construction on the 301 site is humming along. The building is taking shape with framing and the application of exterior gypsum sheathing complete. Waterproofing has been installed at the podium level, and the TPO (thermoplastic polyolefin) roofing material installation is done.

Posted in Architecture, Community Design, General, Urban | Tagged , , , , , , , | Leave a comment

Construction at The 301 is moving along quite nicely this month. The contractor engaged WHA to assist in creating plans for a wall mock-up. These are often used on larger projects where there are multiple unique window, door and wall details.

Posted in Architecture, Architecture Styles, Community Design, Multi-Family Housing, Rendering Studio, Urban | Tagged , , , , , | Leave a comment