Construction on the 301 site is humming along. The building is taking shape with framing and the application of exterior gypsum sheathing complete. Waterproofing has been installed at the podium level, and the TPO (thermoplastic polyolefin) roofing material installation is done.

Posted in Architecture, Community Design, General, Urban | Tagged , , , , , , , | Leave a comment