Construction on the 301 site is humming along. The building is taking shape with framing and the application of exterior gypsum sheathing complete. Waterproofing has been installed at the podium level, and the TPO (thermoplastic polyolefin) roofing material installation is done.

Posted in Architecture, Community Design, General, Urban | Tagged , , , , , , , | Leave a comment

Rick Aiken, a Senior Principal, directs the WHA Urban Mixed-Use Design Studio. With over 29 years of experience and a large body of work in and around the West Coast, Rick has become a leader in urban design with a focus on higher density and mixed-use projects. Join us as we ask him about his […]

Posted in Architecture, Community Design, General, Leadership, Urban | Tagged , , , , , , , | Leave a comment